4D Construction Progress: IFC + Temporal Point Cloud Demo
Scrub through structural phases, follow a lifted panel and reveal a deliberately shifted column return cluster against the IFC reference.
Actual IFC Viewer Online construction scene with phased point-cloud structure, moving lifted panel and red shifted-column deviation returns
A 4D construction view becomes useful when time reveals a decision: what exists now, what is planned next and where the observed geometry no longer agrees with the reference. A cinematic build animation answers none of those questions unless every temporal state remains anchored to inspectable project coordinates.
This browser example activates slab, column, wall and beam returns in phases. A panel moves through a lift path and, late in the sequence, one deliberately shifted column cluster turns red. The scenario is synthetic and labelled; the playback, bounded GPU update and IFC alignment are the same product path used by external temporal adapters.
Run the 4D progress example
Structural progress — IFC + temporal point cloud
Interactive 20-second sequence with roughly 41,000 visible points, phased structure, a lifted panel and a deliberate deviation cluster.
Progress timeline is running — scrub to inspect phases
Designed, observed and inferred are different layers
| Layer | What it means | What it must not imply |
|---|
| IFC geometry | Planned reference and element identity | That the element has been installed |
| Temporal points | Observed or simulated spatial returns at a time | Automatic acceptance or dimensional compliance |
| Deviation colour | A comparison result under declared assumptions | Survey-grade accuracy without registration evidence |
| Timeline status | Playback position or acquisition epoch | A live connection unless a source is actually connected |
Download the construction example
Open the construction IFC4 reference beside the representative construction PLY. The source generator and tests keep model dimensions, point bounds and fixed replay capacity reproducible.
How to make a real progress timeline defensible
- Preserve the original scan and acquisition timestamp.
- Register every epoch into one site frame using control, targets or a validated SLAM trajectory.
- Record coverage and sampling so missing points are not mistaken for missing work.
- Compare only the relevant IFC elements and publish the tolerance used.
- Keep human review available before a status becomes an approval or payment event.
Why the bounded replay matters at a trade fair
The example peaks below a fixed 43,000-point buffer and reuses its typed arrays. That keeps the page responsive while the presenter moves the camera and scrubs the timeline. The same controls expose stable and fault-injected transport so the performance story is visible rather than hidden behind a prerecorded screen capture.
4D Construction Progress: IFC + Temporal Point Cloud Demo